Tel: 0044 1484 460611

Suppliers of Pre-owned & Reconditioned Textile Machinery

COLD PAD BATCH DYEING

YEAR RE-CON TO ORDER 2022, MODEL 222/11 PRE-TENSION ENTRY E+L KF20-20 GUIDERS MOUNTED ON A MANUAL ADJUSTER RAIL 2 ENTRY PATH ROLLERS IN 316 STAINLESS STEEL KUSTERS DYE PADDER TYPE-222-11-1800 LIQUOR TROUGH APPROX 55 LITRES LIQUOR CONTENT CONSTRUCTED IN 316 STAINLESS STEEL WITH COOLING JACKET. 1 – TROUGH ROLLER AND DISPLACER OR 4 - TROUGH ROLLERS FOR UNDER LIQUOR SQUEEZING, PNEUMATIC LIFTING AND LOWERING WITH LIQUOR LEVEL SENSING TO SIGNAL THE 4-1 RATIO DOSING PUMP, ONE ADJUSTABLE RUBBER COVERED EXPANDER BOW ROLLER 2 - SWIMMING ROLLERS 220MM DIAMETER, COVERED WITH PVC NITRILE RUBBER SHORE HARDNESS 65-70. THE TWO HYDRAULIC S ROLLERS ARE HORIZONTALLY OPPOSED TO GIVE A VERTICAL FABRIC LINE, SQUEEZE PRESSURE THAT IS CONTROLLED VIA THE INFINITELY VARIABLE HYDRO PNEUMATIC CONTROL SYSTEM WITH 3 PRECISION PRESSURE REGULATORS PRODUCING PERFECTLY EVEN EXPRESSION ACROSS FACE OF ROLLERS 2 STAINLESS STEEL SPRAY PIPES TO WASH SQUEEZE ROLLERS SAFETY NIP GUARDS WITH EMERGENCY STOP WIRE FITTED TO COMPLY WITH EUROPEAN CE MARKINGS MAIN DRIVE SIEMANS 11 KW AC 415 VOLTS 50 HZ RIGHT ANGLED GEARED MOTOR CONTROLLED BY ELECTRONIC VARIABLE SPEED INVERTER MOUNTED IN NEW IP55 CONTROL PANEL INFINITELY VARIABLE SPEED CONTROL 0-60 METERS PER MINUTE FACILITY TO RECEIVE A VOLTAGE SIGNAL VIA A TACHO GENERATOR FROM ANY SELECTED MASTER DRIVE OPERATORS REMOTE STATION WITH AUTO-MANUAL CONTROLS TAKE OFF ON TO A BASTIAN CENTER WIND NONE CONTACT BATCHER THE MACHINE IS COMPLETE WITH 4-1 RATIO DOSING PUMP 2 X 500 LITRE MIXING TANKS WITH MIXERS RECONDITIONING WORK AS FOLLOWS: Completely strip the machine down to its individual components shot blast clean and repaint all reusable parts. Mechanical work Replace all transmission parts such as bearings belts and chains All new fasteners such as nuts and bolts. Recondition all geared drives and fit with new motors or rewind the original motor Recover with new rubber the 2 S rollers Recover with new rubber the 1 bow roller Recover with new rubber tape covering the fabric draw rollers Polish all ss path rollers and stainless-steel trough Electrical work New control panel with new AC inverter by ABB or Siemens all new cables & safety switches from the main control panel to the motors and switches.