TYPE-222-11-1800 RECONDITIONED TO ORDER 2023
SUITABLE FOR COLD PAD BATCH DYEING, (ORIGINAL YEAR 2002)
PRE-TENSION ENTRY, E+L KF20 GUIDERS MOUNTED ON A MANUAL ADJUSTER RAIL
2 ENTRY PATH ROLLERS IN 316 STAINLESS STEEL.
LIQUOR TROUGH APPROX 55 LITRES, LIQUOR CONTENT CONSTRUCTED IN 316 STAINLESS STEEL WITH COOLING JACKET.
1 - TROUGH ROLLER WITH LIQUOR DISPALCER, PNEUMATIC LIFTING AND LOWERING WITH LIQUOR LEVEL SENSING TO SIGNAL
ONE ADJUSTABLE RUBBER COVERED EXPANDER BOW ROLLER 2 - SWIMMING ROLLERS 220MM DIAMETER,
COVERED WITH PVC NITRILE RUBBER SHORE HARDNESS 65
THE TWO HYDRAULIC SWIMMING ROLLERS ARE HORIZONTALLY OPPOSED TO GIVE A VERTICAL FABRIC LINE, THE SQUEEZE PRESSURE IS CONTROLLED VIA THE INFINITELY VARIABLE HYDRO PNEUMATIC CONTROL SYSTEM WITH 3 PRECISION PRESSURE REGULATORS PRODUCING PERFECTLY EVEN EXPRESSION ACROSS FACE OF ROLLERS
2 STAINLESS STEEL SPRAY PIPES TO WASH SQUEEZE ROLLERS, SAFETY NIP GUARDS WITH EMERGENCY STOP WIRE FITTED TO COMPLY WITH EUROPEAN CE MARKINGS
NEW MAIN DRIVE SIEMANS 11 KW AC 415 VOLTS 50 HZ RIGHT ANGLED GEARED MOTOR CONTROLLED BY ELECTRONIC VARIABLE SPEED INVERTER MOUNTED IN NEW IP55 CONTROL PANEL INFINITELY VARIABLE SPEED CONTROL 0-60 METERS PER MINUTE
FACILITY TO RECEIVE A VOLTAGE SIGNAL VIA A TACHO GENERATOR FROM ANY SELECTED MASTER DRIVE
STAINLESS STEEL OPERATORS REMOTE STATION WITH AUTO-MANUAL CONTROLS
TAKE OFF ON TO A CENTER WIND NONE CONTACT BATCHER
COMPLETE WITH SERA 4-1 RATIO DOSING PUMP 2 X 500 LITRE MIXING TANKS WITH MIXERS
RECONDITIONING WORK AS FOLLOWS:
Completely strip the machine down to its individual components shot blast clean and repaint all reusable parts.
Mechanical work
Replace all transmission parts such as bearings belts and chains
All new fasteners such as nuts and bolts.
Recondition all geared drives and fit with new motors or rewind the original motor
Recover with new rubber the 2 S rollers
Recover with new rubber the 1 bow roller
Recover with new rubber tape covering the fabric draw rollers
Polish all ss path rollers and stainless-steel trough
Re calibrate the 2 S rollers ready to run
Electrical work
New control panel with new AC inverter by ABB or Siemens all new cables & safety switches from the main control panel to the motors and switches.